Home / Quality
Certification is the entry ticket
A burner OEM does not buy a transformer. It buys a component that will not hold up its own listing, its own warranty and its own field reputation. Every certificate below is either in place or running against a dated plan — nothing is "in progress" without a route and a date.
Every unit, or the
whole design.
Two different questions decide reliability. Routine test proves the unit in front of you; type test proves the design behind it. Both are documented, and both are available to your lab.
Hipot at 2× rated + 1000 V, turns ratio, no-load current and spark gap on every unit — not a sample.
Temperature rise at rated duty, dielectric strength, insulation resistance and 10,000-cycle endurance on the design.
Core lot, wire lot, potting batch and test record tied to the date code stamped on the nameplate.
CoC, dimensional report, test data. PPAP level 3, FAI and 8D available on request.
Your file, our file,
or neither.
This is the first question a North American sourcing manager asks, and the answer changes the schedule. Here is how it actually works.
Three routes
- Under your file. Your listing names us as the manufacturer. We pass the UL follow-up inspection at this plant. Fastest route if you already hold a file.
- Under our file. Our own UL 506 recognition is in process. Once issued, any customer can reference it without carrying the cost.
- Neither. For non-listed applications — some industrial and export markets — the part ships with type-test data and a declaration instead.
We have built to UL 506 and UL 2161 for the North American market since 1995, under customer listings. That means the plant has been through UL follow-up inspection repeatedly — the file number changes with the customer, the factory and the process record do not.
Ask for the latest inspection record with any quotation. If a supplier cannot produce one, the listing claim is worth nothing.
What arrives
with the parts.
Paperwork is part of the product. A shipment without the right documents stops at receiving, whatever the parts are like.
- Per shipment
- Certificate of conformity · packing list · test data summary · RoHS/REACH declaration
- Per program
- First article inspection report · dimensional report · PPAP level 3 on request
- Per failure
- 8D report inside 10 working days, with returned-part analysis and lot trace
- Audits
- Customer and third-party audits at the plant, 5 working days notice
- Samples
- Test report with every sample set — hipot, ratio, no-load, spark gap
- Language
- Documents in English by default; other languages on request