Built to your drawing.
Or to our platform.
Potted, dry-type ignition transformers from 4 kV to 26 kV peak — 120 V and 230 V, 15 to 48 mA, 20% to 100% duty. Drawing to first article in six weeks. Production in four.
Free samples · NDA before drawings · Plant in Wujiang, Suzhou
Four inductive classes.
Plus electronic.
Most burner platforms sit in one of these four bands. We build all four on the same EI-core, vacuum-impregnated, epoxy-potted platform — so a new rating is a tooling change, not a new factory.
Compact & commercial
Gas burners, wall-hung boilers, packaged rooftop units, small industrial burners.
- Peak
- 2×4 / 6 kV
- Current
- 20 – 25 mA
- Duty
- 100 %
Industrial gas & light oil
Industrial gas trains, dual-electrode burners, packaged boilers, process heaters.
- Peak
- 7 / 8 kV
- Current
- 15 – 40 mA
- Duty
- 20 – 100 %
Heavy oil & large furnace
Heavy-oil burners, large industrial furnaces, utility and process boiler fronts.
- Peak
- 10 / 15 kV
- Current
- 22 – 35 mA
- Duty
- 20 – 100 %
High-energy ignition
Large heavy-oil burners, cold-start and high-moisture duty, oversized electrode gaps.
- Peak
- 20 / 26 kV
- Current
- 40 – 48 mA
- Duty
- 20 / 50 %
Same job, half the size.
A ferrite step-up driven by a switching module instead of a 50/60 Hz EI stack: 4 – 20 kV peak, 12/24 V DC or 120/230 V AC input, 100 % continuous duty, constant spark rate. The part new burner platforms are being designed around — and one we take OEM and ODM programs on, on the same terms as the inductive range.
- Output
- 4 – 20 kV peak
- Input
- 12/24 V DC · 120/230 V AC
- Spark rate
- 20 – 100 Hz
- Duty
- 100 % continuous
- Format
- Potted module or board in your housing
Start from a part
you already run.
Give us the housing you have and the rating you need. The full table maps common burner-market ratings to our platform models, so a first conversation starts from dimensions and figures instead of a blank page.
| Kmwell model | Band | Input | Output (peak) | Current | Duty |
|---|---|---|---|---|---|
| KTX-406 | 4–6 | 230 V | 2 × 4 kV | 20 mA | 100% |
| KTX-606 | 4–6 | 120 V | 6 kV | 25 mA | 100% |
| KTX-750 | 7–8 | 230 V | 2 × 7.5 kV | 40 mA | 50% |
| KTX-1525 | 10–15 | 230 V | 15 kV | 25 mA | 20% |
| KTX-2040 | 20–26 | 230 V | 20 kV | 40 mA | 20% |
Reference ratings describe the market segment and typical figures, not electrical identity with any specific product. See the full 13-model table →
Three ways to place
a program with us.
A burner manufacturer with a full engineering department needs a build-to-print supplier. A distributor launching a private label needs a designer. Both come off the same line — only the boundary of responsibility moves.
Your drawing, our tooling
You send the drawing and the approved specification. We tool, build and test to it. No design fee, and the drawing stays yours.
- ·Quotation against drawing in 3 working days
- ·First article with dimensional and electrical report
- ·Tooling owned by you, or amortised to zero
Our platform, your variables
Start from a KTX platform and change the core stack, ratio, terminals, lead length, potting colour and mounting. Shortest path to a differentiated part.
- ·Engineering review inside 5 working days
- ·3D step model and housing drawing supplied
- ·NRE quoted per variant, waived at volume
Your brand, no Kmwell mark
Nameplate, carton, insert, barcode and drop-ship all carry your identity. Nothing on the part or packaging points back to us.
- ·Label and packaging artwork handled in-house
- ·Carton and pallet spec matched to your DC
- ·No Kmwell branding on part, box or paperwork
Compare the three models, the customisation matrix and tooling terms →
Certification is
the entry ticket.
Burner OEMs do not buy transformers — they buy a component that will not hold up their own listing. Every certificate below is either in place or running against a dated plan.
Six weeks, five moves.
The schedule is fixed at quotation, not discovered at shipment. Every step has a named deliverable you can hold us to.
Two-way NDA inside a day. Send a drawing, a sample, or a rating and a photo.
Price, tooling, lead time and MOQ against the drawing — with the duty cycle stated.
Two to five units, free, with dimensional and electrical report.
FAI report, PPAP level 3 if required, and a production slot reserved.
First production lot out of the door. Repeats run in three weeks.